Skip to content

Manufacturing

Technology for manufacturers who cannot stop the line.

Production planning, MRP, and plant-floor integration for organisations where a system outage means a stopped line and a missed shipment.

30 minutes with an engineer who has worked in this sector

  • 3days

    Month-end close at Trakhon Industrial

What we hear

Three things that are true in almost every manufacturing business we meet

If none of these describes you, we are probably not the right call — and that is a useful thing to establish early.

  • 01

    Planning runs on spreadsheets

    Production planning lives in a workbook maintained by one person, and nobody else can run it when they are away.

  • 02

    Stock is a guess

    The system says one thing, the floor says another, and you find out you are short of a component when the line stops.

  • 03

    Multi-site reporting takes a fortnight

    Each plant runs its own system, so consolidated numbers arrive too late to act on.

Same sector

Work we have done in this industry

Heavy manufacturing plant interior
ManufacturingTrakhon Industrial

Month-end close cut from 11 days to 3 across four plants

Four plants ran four different systems. Consolidated reporting took a fortnight and finance had stopped trusting it.

Month-end close
3daysMonth-end closefrom 11 days
From kickoff to go-live
14wkFrom kickoff to go-live
Hours of unplanned downtime
0Hours of unplanned downtime

By outcome

What we do about it

Each of these maps directly onto one of the pressures above.

  • Modernise legacy systems

    Core systems are twenty years old and nobody dares touch them.

    Incremental replacement with no operational stoppage.

    0Days of production downtime
  • Get numbers you can trust

    Three departments report three different revenue figures.

    One warehouse, one definition, reconciled to the ledger.

    3daysMonth-end close, down from 11
  • Connect what you already own

    ERP, CRM, and the plant floor have never spoken to each other.

    An integration layer your team can extend without us.

    40+Systems integrated

Compliance

What procurement will ask us for

We have answered these questionnaires before. Starting the third-party risk assessment in week one is usually the difference between a Q1 and a Q2 start.

  • ISO 9001 quality management evidence generated from the system
  • Full audit trail on stock movements and production orders
  • Segregation of duties configured before go-live, not after a finding
  • Traceability from finished goods back to raw material lot

By capability

Services this sector buys

  • ERP implementation

    Close your books in three days, not three weeks.

    • Fit-gap analysis
    • Data migration
    • Cutover and hypercare
    See the service
  • System integration

    Make the systems you already own talk to each other.

    • API gateway
    • Event backbone
    • Monitoring
    See the service
  • Managed services

    Named engineers against a written SLA, not a ticket queue.

    • Tiered support
    • Proactive monitoring
    • Quarterly reviews
    See the service
  • Automation

    Give your team back the day they lose to re-keying.

    • Process mapping
    • Automation build
    • Benefit tracking
    See the service
They gave us a fixed go-live date in week two and hit it. What I actually valued was that the handover documentation was good enough that my team ran the second plant rollout themselves.

Nguyen Thi Lan

Chief Financial Officer, Trakhon Industrial

3days

Month-end close, down from 11

FAQ

Questions from manufacturing buyers

Still have questions?

Ask an engineer directly. No sales sequence.

Can you integrate with our existing plant-floor equipment?

Usually. We have integrated PLCs, SCADA systems, and scanning hardware from most of the common vendors. Where equipment genuinely has no interface, we say so in the assessment rather than discovering it in build.

Will the line have to stop for go-live?

No. We schedule cutover around your production calendar and rehearse it hour by hour with a rollback point at each stage. Across 18 migrations we have not caused a day of production downtime.

We have four plants on four systems. Where do we start?

With whichever plant has the most representative complexity, not the easiest one. Proving the hard case first is what makes the remaining three predictable — and it is usually why the previous programme stalled.

Next step

Talk to someone who has delivered in manufacturing.

Thirty minutes. We will tell you where we have direct experience and where we would be learning your world alongside you.

30 minutes · no obligation · a straight answer about fit