Skip to content

Platform

Aureus ERP Suite

Finance, inventory, and production planning for mid-market manufacturers who need multi-site consolidation without a tier-one licence bill.

  • Multi-site consolidation on one chart of accounts
  • MRP driven by live plant-floor consumption
  • Lot traceability from finished goods to raw material
  • Audit trail and segregation of duties configured before go-live

Demos run on your scenarios, not a canned script.

Overview

Where this fits

Finance, inventory, and production planning for mid-market manufacturers who need multi-site consolidation without a tier-one licence bill.

Production deployments
22Production deployments
Concurrent users tested
2,000Concurrent users tested
Median rollout
14wkMedian rollout

Features

What it does

  • Consolidation without a spreadsheet

    Intercompany elimination runs automatically on every close, with exceptions surfaced daily rather than at period end.

  • MRP that trusts the floor

    Scanning hardware publishes actual consumption, so planning reconciles against what happened rather than what was scheduled.

  • Traceability built in

    Every finished-goods lot resolves to its raw material lots and the production orders between them.

  • Extensible without us

    Documented extension points and a configuration model your team edits, reviewed like code.

  • Deploy where policy requires

    Cloud or on-premise from the same codebase, with the same upgrade path.

  • Reporting reconciled to the ledger

    The semantic layer ships with definitions that tie to the general ledger on every load.

Specifications

The detail your architect will ask for

Technical specification for Aureus ERP Suite
SpecificationValue
DeploymentCloud (AWS/Azure) or on-premise
Core modules9 — finance, inventory, production, purchasing, sales, quality, maintenance, HR, reporting
Optional modules14
Typical rollout14 weeks single-site, 22 weeks multi-site
Concurrent usersTested to 2,000
DatabasePostgreSQL 15+
LocalisationEnglish, Vietnamese; VAS and IFRS chart templates
Upgrade cadenceTwo major releases per year, 5-year support window

Integrations

What it connects to out of the box

Anything not on this list is an integration project, and we will quote it honestly rather than describing it as configuration.

  • Salesforce
  • Microsoft Dynamics CRM
  • Shopify
  • SAP
  • Banking (ISO 20022)
  • PLC / SCADA via OPC-UA
  • Power BI
  • Tableau

In production

A client running this

Heavy manufacturing plant interior
ManufacturingTrakhon Industrial

Month-end close cut from 11 days to 3 across four plants

Four plants ran four different systems. Consolidated reporting took a fortnight and finance had stopped trusting it.

Month-end close
3daysMonth-end closefrom 11 days
From kickoff to go-live
14wkFrom kickoff to go-live
Hours of unplanned downtime
0Hours of unplanned downtime

FAQ

Questions about Aureus ERP Suite

Still have questions?

Ask an engineer directly. No sales sequence.

How does this compare to SAP Business One?

For single-site manufacturers with standard processes, SAP B1 is often the better buy and we implement it. Our suite wins where multi-site consolidation and plant-floor integration are the dominant requirements, because those are built in rather than added. We will tell you which case you are in during the selection review.

Are we locked in?

The data model is documented and the database is standard PostgreSQL. Export tooling ships with the product. We would rather you stayed because leaving is easy than because it is hard.

What does the licence cost?

Per named user with a site minimum, quoted after we know your module set and user profile. Implementation is quoted separately so you can see both numbers.

Related

  • A project team working together around a table
    Platform

    Aureus CRM

    Pipeline, quoting, and after-sales service in one record of customer truth.

    Deployment
    Cloud
    Integrations
    ERP, email, telephony
    Typical rollout
    6 weeks
  • Stacked shipping containers at a export container terminal
    Product

    TraceFlow

    Lot-level traceability from field to container, built for food exporters.

    Deployment
    Cloud
    Standards
    GS1, GlobalG.A.P.
    Typical rollout
    8 weeks
  • Rows of server racks in a data centre aisle
    AI

    Aureus Assist

    Document and enquiry automation with an evaluation harness you control.

    Deployment
    Cloud or VPC
    Languages
    EN, VI, JA
    Typical rollout
    5 weeks

Next step

See it against your own scenarios.

Bring three things that are hard in your current system. We will show you what this does with them, or tell you it does not help.

30 minutes · your data shapes the agenda