Skip to content

Cloud migration

Migrate to cloud, properly.

Average 38% infrastructure cost reduction in year one, and zero audit findings at first post-migration review. Landing zones designed for cost control and evidence from the start.

30 minutes · no obligation · written scope estimate

  • 38%

    Average cost reduction

  • 0

    Audit findings at first review

  • 11mo

    Median programme duration

Overview

What this actually involves

Lift-and-shift usually reproduces the old problems on someone else's hardware and adds a bigger bill. We design the landing zone first — accounts, networking, identity, tagging, guardrails — so that cost attribution and audit evidence are properties of the platform rather than a later project.

Then workloads move in waves, with each wave proving a class of problem before the next one starts.

What we actually fix

What we are usually called in to fix

Three problems, in the words clients use when they describe them to us.

  • The problem

    We moved to cloud and the bill went up.

    What we do

    Tagging and account structure that attributes every dollar to a team, plus rightsizing and commitment planning as part of the migration rather than after it.

    Result

    −38% cost

  • The problem

    The regulator rejected our last cloud plan twice.

    What we do

    Data residency, encryption, and evidence collection designed into the landing zone, with the control mapping written for the auditor to read.

    Result

    0 findings

  • The problem

    Nobody knows what half these servers do.

    What we do

    Dependency discovery before the wave plan, so the things nobody understands get assessed rather than migrated blind.

    Result

    11 mo programme

What you get

How this is different from the version that failed last time

  • Landing zone first

    Accounts, networking, identity, and guardrails before a single workload moves.

  • Cost attributed from day one

    Tagging enforced by policy, so every dollar has an owner.

  • Audit evidence automated

    Control mapping and evidence collection built in, not assembled at review time.

  • Wave-based migration

    Each wave proves a class of problem before the next begins.

  • Dependency discovery first

    The servers nobody understands get assessed, not migrated blind.

  • Run it or hand it over

    Managed service or full handover with runbooks — decided before cutover.

How we work

How the engagement runs

Durations are medians. Your assessment turns them into dates.

  1. 1

    Assess

    Two weeks inside your current environment with the people who run it, not a questionnaire.

    Duration
    2 weeks
    Deliverable
    Written findings and a scope estimate
  2. 2

    Design

    Target state and a sequence that proves the risky parts first, signed off before build.

    Duration
    2–3 weeks
    Deliverable
    Blueprint and phased plan
  3. 3

    Deliver

    Increments demonstrated to your process owners every two weeks rather than reported on.

    Duration
    8–16 weeks
    Deliverable
    Working system in production
  4. 4

    Operate

    Handover with runbooks, or transition to our managed service against a written SLA.

    Duration
    Ongoing
    Deliverable
    Runbooks and support transition

Proof

The same work, at a client

Glass office towers in a financial district
FinanceMeridian Bank

Regulated workloads moved to cloud with zero audit findings

A cloud programme had stalled twice on the regulator’s data-residency and evidence requirements.

Audit findings
0Audit findings
Infrastructure cost reduction
38%Infrastructure cost reduction
Programme duration
11moProgramme duration
They gave us a fixed go-live date in week two and hit it. What I actually valued was that the handover documentation was good enough that my team ran the second plant rollout themselves.

Nguyen Thi Lan

Chief Financial Officer, Trakhon Industrial

3days

Month-end close, down from 11

By capability

Services that deliver this

Each has its own page with scope, process, deliverables, and price signal.

  • Cloud & DevOps

    Deploy on a Friday without anyone losing sleep.

    • Landing zone
    • CI/CD pipelines
    • Cost governance
    See the service
  • Cybersecurity

    Close the findings before the auditor arrives.

    • Assessment
    • Remediation
    • SOC monitoring
    See the service
  • Infrastructure

    Capacity sized for what you actually run.

    • Network design
    • DR testing
    • Capacity planning
    See the service
  • Consulting

    A decision you can defend to your board.

    • Current-state review
    • Options analysis
    • Written recommendation
    See the service

FAQ

Questions about cloud migration

Still have questions?

Ask an engineer directly. No sales sequence.

AWS or Azure?

Whichever your organisation can actually operate. We hold Advanced tier on AWS and Solutions Partner on Microsoft, and the selection review names the trade-offs for your specific workloads and skills. If the honest answer is "stay where you are for these three systems", we will say that.

Will our bill really go down?

It goes down in nine cases out of ten, by a median of 38% in year one, but only because rightsizing and commitment planning are part of the migration. A lift-and-shift with no rightsizing usually costs more, which is why we do not sell one.

How long before we can decommission the data centre?

The wave plan produces that date in the design phase. Typically the last wave lands three to five months before the lease or hardware refresh you are trying to avoid, deliberately.

What about the systems that cannot move?

Some genuinely cannot, and the assessment says so early. Those get a connectivity and lifecycle plan rather than a migration, and we do not bill you to move something that should not move.

Next step

Tell us where you are stuck.

An engineer, thirty minutes, and a straight answer about whether this is the right approach for you.

No sales sequence — one reply from an engineer.